Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Sep 18, 2022     Front Seat Installation pt. 3       Category: Interior Finish
Also finished installing the AeroSport Seat Levers. Very straight forward installation and a nice addition. One hole needed to be drilled in the side of the seat frame for the pivot bolt. 12 1/2” from the front of the seat frame and 1 7/16” up from the bottom of the seat frame. Had to hammer out the pin to remove the "T" handle. The pivot bolt is a 1/4” AN4-6 bolt and two washers. Then replaced the OEM handle with a 3/4” 5-40 fastener through the stock handle and the seat lever and fastened with washers and a lock nut.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.